Originally Posted By: DrMag1
I have issued a MOLD redesign engineering project to increase the rigidity of the bottles. (We make our own bottles) It will be RE-TOOLED this weekend with the design changes and I expect new bottles to be packaged in the next 2-4 weeks or so. It will take some time for Amazon to get the new product through the warehouse. Thanks for all the feedback.
WD
I, for one, am very impressed!
This is exactly how a business USED to be successfully run...
Should'a bought some when it was available!
Cheers!
I have issued a MOLD redesign engineering project to increase the rigidity of the bottles. (We make our own bottles) It will be RE-TOOLED this weekend with the design changes and I expect new bottles to be packaged in the next 2-4 weeks or so. It will take some time for Amazon to get the new product through the warehouse. Thanks for all the feedback.
WD
I, for one, am very impressed!
This is exactly how a business USED to be successfully run...
Should'a bought some when it was available!
Cheers!