Originally Posted by tcp71
You could put the jack stands in, lower the suspension, put boards under the wheels, raise the suspension, raise the jack stands, lower the suspension, add more boards, raise the suspension, raise the jack stands, etc until you have the height you want.
The nerd in me likes this but the pragmatist knows if I just jack about a foot rear of the firewall with my 3 ton floor jack both tires on that side will lift off the ground and it only takes ~30 seconds.
You want ample working room bleeding brakes so you don't side-load the bleeder due to poor ergonomics and snap it off.