Recent Topics
Mazda SkyActiv FZ 71,210mi
by yugrus. 10/22/18 01:24 PM
To Storage Clean or Dirty?
by lzhome. 10/22/18 01:09 PM
Auto or stick in a pick up
by ram_man. 10/22/18 01:06 PM
FRAM COR10060TLE (Cut Open)
by Hootbro. 10/22/18 12:45 PM
2018 Elantra Oil Change
by FFeng7. 10/22/18 12:44 PM
Is Your Router Secure? Probably Not!
by SubLGT. 10/22/18 11:51 AM
2018 Dodge Caravan - PentaStar 3.6L V6 Check In
by StevieC. 10/22/18 11:11 AM
Bank Deposit
by Zee09. 10/22/18 10:54 AM
TUFOIL
by Diesel12. 10/22/18 10:26 AM
6k miles on H-6 Subaru 3.6R - time for synthetic?
by DirtyApe. 10/22/18 10:25 AM
Ram 4.7 Broken Manifold Bolts
by outoforder. 10/22/18 10:18 AM
Anti 2nd Amendment companies?
by Ed_Flecko. 10/22/18 10:10 AM
radiator cleaner on the inside than the outside? Looks good!
by motor_oil_madman. 10/22/18 10:05 AM
moog inner tie rod worn out in 2 years
by motor_oil_madman. 10/22/18 09:59 AM
2015 Nissan frontier
by millerbl00. 10/22/18 08:04 AM
2018 Sonata
by Throt. 10/22/18 07:12 AM
Newest Members
Rocketman777, BillPf, matt2636, zaRin, Maciejew
66265 Registered Users
Who's Online Now
92 registered members (1989outlaw, Alfred_B, Andy636, 53' Stude, 6 invisible), 2,006 guests, and 36 spiders.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums67
Topics292,362
Posts4,878,247
Members66,265
Most Online2,494
Oct 17th, 2018
Donate to BITOG
Previous Thread
Next Thread
Print Thread
Hop To
Page 1 of 2 1 2
Nuclear refurbishment in Ontario #4579124
11/19/17 04:37 PM
11/19/17 04:37 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
As most of you know, I'm a bit passionate about Nuclear power and a big fan of our uniquely Canadian CANDU reactors. CANDU's generally have a time between refurbishments of ~30 years, however that is extendable to a point, provided there are no issues. CANDU facilities are, in Ontario, of high density with a large number of units per site. This makes them more economically viable, as it ensures greater output per site and lower staffing levels per kWh.

Ontario has three operating nuclear power plants that range in size and age:

1. Pickering Nuclear - This was a "proof of concept" facility, it was the first full-scale commercial nuclear facility in Canada, a follow-up to the single tiny unit at Douglas Point, which would later host Bruce. Pickering is an 8-unit site, built in two phases with an "A" and "B" section. The older "A" section commencing construction in 1966 and started producing power in 1971. "B" came on-line starting in 1983. Pickering, due to its age, consists of 4x515MWe units (2x active) and 4x516MWe units (all four active). It produces ~20TWh a year. Pickering was deemed non-viable for refurbishment and will begin its shutdown in 2024 after producing power for 53 years.

2. Bruce Nuclear - This is the crown jewel of the Canadian nuclear fleet and the follow-up to Pickering, commencing construction in 1970 and brought on-line in 1977. Bruce is the largest operating nuclear facility in the world, producing a staggering 48TWh a year, enough to run the entire country of Denmark with significant excess. Bruce, like Pickering, consists of an "A" and "B" site. Bruce "A" has 4x779MWe CANDU reactors, Bruce "B" has 4x817MWe units. When Bruce Power (a private corporation) took over the site from Ontario Power Generation, the A site had two units down in need of refurbishment and the entire "A" site was offline. They immediately fired up the two dormant units 3&4 without issue and then went through a first of its kind refurbishment of units 1&2 at a cost of $4.8 billion. Both units were back on-line as of 2012, which allowed for the government to shutter our remaining coal capacity. Bruce will begin its refurbishment of the remaining 6x units once Darlington is done going through its refurbishment. This will maintain Bruce as a source for 30% of Ontario's power for decades to come, with its impending shutdown occurring in the 2060's, though, like Pickering, that may be extended.

3. Darlington Nuclear - This is the newest, and possibly the most controversial of the Ontario facilities. Constructing commenced in 1981, as a follow-up to the highly successful Bruce site. She came on-line between 1990 and 1993, making her significantly newer than the other three. Darlington is most well known for going massively over-budget, like basically every Ontario infrastructure project that has come since. Originally pegged at less than $4 billion, final costs were $14.4 billion, double the 2nd estimate tabled just before construction and massively more than Bruce and Pickering together, despite having half the number of units. Due to the cost overruns, no "B" site at Darlington was ever built (though OPG; Ontario Power Generation still has designs on doing so. Their plan is to add 2-4 ACR1000 reactors to the site, which are 1,200MWe units, banking on the electrification of transportation as a driver). If the expansion of Darlington eventually proceeds, it will replace Bruce as the most powerful facility in the world. Current installed capacity at Darlington consists of 4x878MWe units. Darlington has begun its refurbishment, at a cost of $12.8 billion which will, given our track record, likely go over-budget, probably significantly. This ensures operation to at least 2055, probably longer, based on the track record with Pickering and all 4 units should be done by 2026, shortly after Pickering's shutdown begins.


A refurbishment of a CANDU involves replacement of all critical parts inside in the reactor building including a new calandria, new tubes....etc. Essentially they gut the reactor. The turbines are also rebuilt. When Bruce was done, they upgraded the capacity, though I don't see that happening this time around, though it is possible.

The fuel channel tubes "grow" over time in a CANDU and are, during maintenance breaks, un-welded, shortened, and re-welded. So while they are never taken off-line for refuelling like a US PWR/BWR, they are taken off-line briefly for maintenance windows.

This refurbishment programme is, as I see it, an intermediary to allow OPG to figure out what the heck they are doing to replace existing capacity and to observe market trends. We've invested significant money in the development of SMR reactors (molten salt mostly) which will likely end up replacing Pickering, despite our development of alternative fuel variants of existing CANDU's. We expect to have functional and deployable SMR's in the next 7 years, which coincides well with Pickering's shutdown process.


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579129
11/19/17 04:43 PM
11/19/17 04:43 PM
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
StevieC Online content
StevieC  Online Content
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
Nice. Thanks thumbsup

Canada


'18 Dodge Grand Caravan GT - Valvoline (Break-in)
'06 Santa Fe - 535,000km AMSOIL SS 0w30 / ATF
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579140
11/19/17 04:50 PM
11/19/17 04:50 PM
Joined: Jul 2007
Posts: 4,269
Midwest USA
LoneRanger Online content
LoneRanger  Online Content
Joined: Jul 2007
Posts: 4,269
Midwest USA
Do the CANDU ractors use the French system or whatever to recycle the spent fuel until the radio activity is reduced? Totally shooting from the hip here but remember something about how the French revolutionized nuclear power generation by some special fuel recycling setup or something.

Based on my generalizations above you might think I pronounce it "Nuke-ular" but I promise I say "Nu-clee-ar" ... laugh



'09 Subaru Forester ...................(QS HM 5W30)
'16 Moto Guzzi Stelvio 1200 .....(ENI i-Ride PG 10W60)
Re: Nuclear refurbishment in Ontario [Re: LoneRanger] #4579148
11/19/17 04:54 PM
11/19/17 04:54 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: LoneRanger
Do the CANDU ractors use the French system or whatever to recycle the spent fuel until the radio activity is reduced? Totally shooting from the hip here but remember something about how the French revolutionized nuclear power generation by some special fuel recycling setup or something.

Based on my generalizations above you might think I pronounce it "Nuke-ular" but I promise I say "Nu-clee-ar" ... laugh


No, because our facilities use natural Uranium rather than enriched Uranium. The waste from a CANDU is less dangerous than the tails from the enrichment process, if that helps put things into perspective? shrug


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579169
11/19/17 05:08 PM
11/19/17 05:08 PM
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
StevieC Online content
StevieC  Online Content
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
I still don't think they should be storing it by the lake. shrug


'18 Dodge Grand Caravan GT - Valvoline (Break-in)
'06 Santa Fe - 535,000km AMSOIL SS 0w30 / ATF
Re: Nuclear refurbishment in Ontario [Re: StevieC] #4579172
11/19/17 05:13 PM
11/19/17 05:13 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: StevieC
I still don't think they should be storing it by the lake. shrug


They should be reprocessing it and burning it in AFCR's, but they won't because it is expensive and would involve new reactors, which aren't in the budget after the expenditure disaster with the GEA. Basically, we blew the load on wind and solar and now can't afford to do it.


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579176
11/19/17 05:16 PM
11/19/17 05:16 PM
Joined: Jan 2008
Posts: 10,821
OH
SatinSilver Offline
SatinSilver  Offline
Joined: Jan 2008
Posts: 10,821
OH
What do you think of the two nuclear plants in northern Ohio on Lake Erie, Davis-Bessie and the Perry nuclear plants?

Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579185
11/19/17 05:21 PM
11/19/17 05:21 PM
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
StevieC Online content
StevieC  Online Content
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
Originally Posted By: OVERKILL
Originally Posted By: StevieC
I still don't think they should be storing it by the lake. shrug


They should be reprocessing it and burning it in AFCR's, but they won't because it is expensive and would involve new reactors, which aren't in the budget after the expenditure disaster with the GEA. Basically, we blew the load on wind and solar and now can't afford to do it.


Yup... Sad eh?


'18 Dodge Grand Caravan GT - Valvoline (Break-in)
'06 Santa Fe - 535,000km AMSOIL SS 0w30 / ATF
Re: Nuclear refurbishment in Ontario [Re: SatinSilver] #4579194
11/19/17 05:26 PM
11/19/17 05:26 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: SatinSilver
What do you think of the two nuclear plants in northern Ohio on Lake Erie, Davis-Bessie and the Perry nuclear plants?


I think they are examples as to the difference between how we did Nuclear in Ontario, and how you guys do it in the States.

DB is roughly the same age as Bruce, but has 1x894MWe unit and thus produces 6.3TWh vs 48. Perry is similar to Darlington, but again, with 1/4 of the units, albeit, higher output, so it produces 10TWh versus 26TWh.

Nuclear fuelling costs and processes aren't anywhere near that of a coaler or other fossil-driven station. Your fuel bundles last at least a year IIRC. The staffing and operating costs are what do it, and this is paid for via output; how many kWh you can pump out of the site. Bruce is massive, but relatively cheap to operate thanks to its output. The other two are comparatively more expensive thanks to their lower outputs. Ergo, Darlington's operating costs would go DOWN if we expanded it, not up, despite staffing costs increasing for the 4x additional units.

It's the whole economy of scale argument. When you are being compensated solely on how many kWh you can pump out, affordability is directly tied to that.


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: StevieC] #4579196
11/19/17 05:27 PM
11/19/17 05:27 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: StevieC
Originally Posted By: OVERKILL
Originally Posted By: StevieC
I still don't think they should be storing it by the lake. shrug


They should be reprocessing it and burning it in AFCR's, but they won't because it is expensive and would involve new reactors, which aren't in the budget after the expenditure disaster with the GEA. Basically, we blew the load on wind and solar and now can't afford to do it.


Yup... Sad eh?


Tragic really. We could be turning our waste into power.


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579198
11/19/17 05:29 PM
11/19/17 05:29 PM
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
StevieC Online content
StevieC  Online Content
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
I feel bad for the generations after us. frown


'18 Dodge Grand Caravan GT - Valvoline (Break-in)
'06 Santa Fe - 535,000km AMSOIL SS 0w30 / ATF
Re: Nuclear refurbishment in Ontario [Re: StevieC] #4579204
11/19/17 05:34 PM
11/19/17 05:34 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: StevieC
I feel bad for the generations after us. frown


I feel sorry for me kids! They'll be in the workforce when the entire house of cards constructed by McGuinty and Wynne collapses and all that generation needs to be replaced. The only thing soldiering on at that point will be Bruce and Darlington and all our Hydro-Electric. And those old girls will be vying for retirement when they've got kids of their own. Assuming Bruce makes it through to the 2060's, that's almost 100 years out of that facility, that's pretty darn good for an archaic nuclear thermal. I'd say we got our money's worth out of her and then some.


2018 RAM 1500 Big Horn EcoDiesel
2016 Grand Cherokee SRT
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579210
11/19/17 05:37 PM
11/19/17 05:37 PM
Joined: Mar 2004
Posts: 20,834
Upstate NY
Donald Offline
Donald  Offline
Joined: Mar 2004
Posts: 20,834
Upstate NY
I am hoping fusion will come online before I am too old to care.


2015 Subaru Forester 2.5 engine/CVT
2015 Ford F250 w/Powerstroke
2016 Subaru Crosstrek CVT (wife's)
Re: Nuclear refurbishment in Ontario [Re: OVERKILL] #4579211
11/19/17 05:38 PM
11/19/17 05:38 PM
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
StevieC Online content
StevieC  Online Content
Joined: Aug 2008
Posts: 19,551
Ontario, Canada
I hope not to be living in this province by then. Retired somewhere with decent living costs. It's getting nuts already.


'18 Dodge Grand Caravan GT - Valvoline (Break-in)
'06 Santa Fe - 535,000km AMSOIL SS 0w30 / ATF
Re: Nuclear refurbishment in Ontario [Re: Donald] #4579215
11/19/17 05:39 PM
11/19/17 05:39 PM
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
OVERKILL Offline OP
OVERKILL  Offline OP
Joined: Apr 2008
Posts: 37,500
Ontario, Canada
Originally Posted By: Donald
I am hoping fusion will come online before I am too old to care.


I do too, but at least we'll have MSR's for sure! grin Really keen on seeing the first one of those to be built.