It's official, the government announced the approval of OPG's plan to refurbish the 4x Pickering B units!
Was there for the event, which had very high attendance!
An interesting twist! The plant will be upgraded with a deep water inlet like at Darlington and Bruce, which means a roughly 1km long tunnel along the bottom of the lake so that it draws in deep, cold water far from shore. This will solve the algae bloom issue the plant has experienced during the summer months, which is a result of being located next to the sewage treatment facility.
Was there for the event, which had very high attendance!
An interesting twist! The plant will be upgraded with a deep water inlet like at Darlington and Bruce, which means a roughly 1km long tunnel along the bottom of the lake so that it draws in deep, cold water far from shore. This will solve the algae bloom issue the plant has experienced during the summer months, which is a result of being located next to the sewage treatment facility.